In the period 26.05.2026-12.06.2026, the last construction phase of the B428 in Bad Kreuzung will take place with
half-side closure of the B428 and full closure of the Grenzgraben junction.
During this period, route 206 will be rerouted as follows:
Direction Planig:
- it will travel to Planig as usual via the B428 and Am Grenzgraben and Mainzer Straße
Direction Bad Kreuznach:
- the route will be via Mainzer Straße and the B428 to Bad Kreuznach
- The Seeberflur and Am Grenzgraben stops cannot be served