From November 30, 2026, through March 19, 2027, we will be operating on a winter schedule. In the event of inclement weather, route adjustments will be made in the following locations:
1. Sparbrücken: The Tanneck stop will be omitted. The Huberstraße, Nord stop will serve as a substitute.
2. Seebach: The Unterdorf stop will be omitted. The Dorfplatz stop will serve as a substitute.
3. Hergenfeld: The Jäckel stop is omitted. A stop on Soonwaldstraße, at the intersection with Raiffeisenstraße, will serve as a substitute.
4. Seibersbach: The St. Joseph-Kirche and Tälerblick stops on Hauptstraße will be omitted. Instead, a stop on Stromberger Straße at the intersection with Hauptstraße will be served. The Seibersbach, Grundschule stop will continue to be served via a detour.
5. Hochstetten, Hellbergblick: The “Hochstetten, Hellbergblick” stop is canceled. The “Kirche” stop will serve as a replacement.